Client Qualification Brief

Large-Scale GPU
Cluster Request

Complete this brief prior to pricing, allocation, or delivery discussions. All fields are classified as Mandatory (M) or Desirable (D) to ensure rapid alignment with current inventory including B200/B300 capacity.

Active: H100 256-node / InfiniBand
Active: H200 256-node / InfiniBand
Active: A100 256-node
Available: B200 / B300 Capacity
Classification: M Mandatory requirement D Desirable / flexible Toggle each field's classification as needed

0
Contact Information
Who should we follow up with?
Full Name *
Company / Organization *
Email Address *
Phone / Signal
Role / Title
Priority Qualification Questions
Complete these four questions first — required for rapid first-pass assessment
RAPID FIRST PASS
Is H100, H200, or A100 an exact SKU requirement — or are equivalent / newer GPUs (B200, B300) acceptable?
Exact SKU only
Newer equivalents acceptable
Open to any equivalent compute
Prefer B200/B300
Is InfiniBand mandatory — or would high-speed Ethernet (400G RoCE) be acceptable?
InfiniBand mandatory
High-speed Ethernet acceptable
Either acceptable
No preference
Is the 256-node quantity fixed — or is equivalent total GPU count or aggregate compute capacity acceptable?
Fixed at 256 nodes
Equivalent GPU count acceptable
Total FLOPS / compute matters more
Flexible
Are there location or delivery timeline constraints?
Preferred region / geography
Required delivery / start date
3.1
GPU Requirements
Model, quantity, form factor, and compute specifications
M
A100
H100
H200
B200
B300
Open / equivalent
M
Exact SKU required
Equivalent acceptable
Newer generation preferred
M
Is this fixed, or is flexibility permitted based on total GPU count?
D
SXM
PCIe
No preference
M
M
Bare metal
MIG
Virtual GPU
No requirement
3.2
Networking Requirements
InfiniBand, topology, RDMA, and bandwidth specifications
M
Mandatory
Preferred
Optional
High-speed Ethernet acceptable
D
D
Non-blocking required
Blocking acceptable
No requirement
D
RDMA required
NCCL optimized
High East-West BW
None specified
3.3
CPU & Memory Requirements
Host processor, RAM, and interconnect specifications per node
D
Intel (Sapphire Rapids+)
AMD (Genoa/Turin+)
ARM (Grace)
No preference
D
M
D
Yes
No
Unknown
D
3.4
Storage Requirements
Local NVMe, shared storage, throughput, and checkpointing
D
Required
Preferred
Not required
D
D
Lustre
BeeGFS
NFS
Object storage
None required
D
D
3.5
Deployment & Location
Geography, timeline, commitment term, and delivery requirements
D
US East
US West
US Central
EU
APAC
Flexible
M
Single-site required
Multi-site acceptable
No preference
M
Cloud / hosted
Bare metal
Dedicated cluster
On-premises
M
M
Monthly
6 months
1 year
2 years
3 years
5+ years
TBD
3.6
Commercial & Compliance Constraints
Budget, compliance, OEM preferences, and infrastructure constraints
M
M
Dedicated / no sharing
Multitenant acceptable
No restriction
D
SOC 2 Type II
ISO 27001
FedRAMP
HIPAA
ITAR / EAR
GDPR / EU residency
None
D
D
D
Confidential. Information provided is used solely for infrastructure qualification purposes. SigmaEdge does not share client requirements with third parties without explicit authorization.
Brief Received
Your qualification brief has been submitted. A member of the SigmaEdge infrastructure team will review your requirements and be in touch within one business day.